Warehouse Stock Clearance Sale

Grab a bargain today!


Sign Up for Fishpond's Best Deals Delivered to You Every Day
Go
Civil Engineers Wagons ­Volume 3
Later British Rail: 1978 - 1994

Rating
Format
Paperback, 96 pages
Published
United Kingdom, 9 May 2013

The first five Kestrel Railway Books volumes by David Larkin looked at the revenue-earning wagon fleet operated by British Railways and its immediate successor, British Rail. This volume is the third of three looking at the substantial fleet of specially-designed wagons that were used for track maintenance, and covers a significant change to the wagon fleet from 1978 to 1994.

Concurrent with British Rail freight operations generally, there was positive move towards fully-fitted trains on all regions of the system. On working ballast trains, this could be accomodated by using the vacuum-braked examples of suitable designs, and the early years of the period saw the gradual elimination of unfitted stock, either through withdrawal or by the application of automatic braking systems. To get Civil Engineers materials to the various depots, air-braked stock was either built new, transferrred from the revenue-earning fleet or, eventually, rebuilt from exisitng stock. Finally, the on-track plant fleet became more standardised and a new concept of 'virtual quarries' was introduced, where ballast was stockpiled at specified yards and reloaded into hopper wagons or other types at those locations, rather than at actual quarries, such as Meldon.


This item is no longer available.

Product Description

The first five Kestrel Railway Books volumes by David Larkin looked at the revenue-earning wagon fleet operated by British Railways and its immediate successor, British Rail. This volume is the third of three looking at the substantial fleet of specially-designed wagons that were used for track maintenance, and covers a significant change to the wagon fleet from 1978 to 1994.

Concurrent with British Rail freight operations generally, there was positive move towards fully-fitted trains on all regions of the system. On working ballast trains, this could be accomodated by using the vacuum-braked examples of suitable designs, and the early years of the period saw the gradual elimination of unfitted stock, either through withdrawal or by the application of automatic braking systems. To get Civil Engineers materials to the various depots, air-braked stock was either built new, transferrred from the revenue-earning fleet or, eventually, rebuilt from exisitng stock. Finally, the on-track plant fleet became more standardised and a new concept of 'virtual quarries' was introduced, where ballast was stockpiled at specified yards and reloaded into hopper wagons or other types at those locations, rather than at actual quarries, such as Meldon.

Product Details
EAN
9781905505258
ISBN
1905505256
Other Information
185 black and white photographs
Dimensions
21.7 x 27.2 x 0.7 centimeters (0.40 kg)

Promotional Information

Comprehensive numbering and building details of almost every variety of Engineers Dept wagon built by or for British Railways during this period, written by the acknowledged leading expert in the field.

Review this Product
Ask a Question About this Product More...
 
Look for similar items by category
Home » Books » Nonfiction » Transport » Railroads » General
This title is unavailable for purchase as none of our regular suppliers have stock available. If you are the publisher, author or distributor for this item, please visit this link.

Back to top
We use essential and some optional cookies to provide you the best shopping experience. Visit our cookies policy page for more information.